Bradley Oaks subdivision

Client Name

Delmas Development Inc.

Project Type

homesite clearing/leveling dam/ lake repair and expansion construction project

Bradley Oaks subdivision

Problems

The existing 2-acre lake and dam system required significant expansion and safety improvements to support a luxury lakeside residential development. The aging infrastructure was inadequate for the planned 12-acre water feature and posed erosion and drainage risks.

alt text

Solutions

Performed major upgrades including:

  • Construction of a 15-foot-high earthen dam with a sand filter on the downstream side
  • Installation of a 24-inch RCP pipe drain and a 12-inch gate valve
  • Fabrication and placement of a precast concrete riser structure
  • Construction of an articulated concrete block emergency spillway

These improvements ensured the lake met modern dam safety standards and increased the storage capacity by 500%.

“The transformation of this lake from a modest 2-acre pond into a central feature of the neighborhood was executed with technical precision.” – Diane Kirk, VP Operations, Delmas Development Inc.

Result

A scenic 12-acre lake now serves as the visual and recreational centerpiece of the Bradley Oaks subdivision. The expanded and modernized dam system supports both aesthetic and structural integrity for the surrounding development.

alt text alt text alt text alt text alt text

Unlock Your Dream Home Today!

We encourage you to share your ideas, preferences, and feedback—let’s build something great together.